Epstein Index›Documents›EFTA00584046
⚡IMPACT LEVEL 3 — NOTEWORTHY

Epstein File EFTA00584046: Holder, Cotton and Bedroom (DS9)

General DocumentDate unavailableEFTA005840461 keyword hits
1
views
0
shares
0
reactions
2
persons
5
keywords
6
excerpts

This document is a construction or renovation task list for a property, detailing work on master bedroom and bathroom areas. It includes specific instructions for painting, flooring, lighting, furniture recovery, and installation of fixtures, with references to workers including Ion and Gary Moses. The document mentions sealing work in rooms 1, 2, and 3, and includes measurements for photo placement in a dressing area.

👤 Named in This Document

📋 Key Excerpts6

PersonKeyword
Excerpt 1
/Bathroom Connect master **bedroom** doors into one large door screws ordered lon to paint the blue detail in master vestibule on the doors (after making door
Excerpt 2
Redo master **bedroom** and bath floor Fix master bed lamps Gary Moses Recover the fabric seats in dressing area Hang photos in dressing area(26" down from
Excerpt 3
top, 8.5" over from the right) Japanese shoe rack for outside master bed Landscape lights outside master bath and **bedroom** Landscape "service" area to

Discussion

Let the world know how you feel.

What you just read should make you angry. Channel that into 17 syllables. Our AI helps you craft a haiku in seconds — then share it with the world.

Power hides in dark But sunlight finds every crack Truth cannot be bought

— Sarah K., after reading this document
✍️ Write Your Haiku

Haikus for Humanity — 5 · 7 · 5

React
Share𝕏🦋FBinFund Accountability