Epstein Index›Documents›EFTA01105091
💨IMPACT LEVEL 1 — MEH

Epstein File EFTA01105091: Construction (DS9)

General DocumentDate unavailableEFTA011050911 keyword hits
1
views
0
shares
0
reactions
0
persons
1
keywords
1
excerpts

This document contains a technical schematic for a wellfield construction project dated April 20, 2012, identifying Well E-7871-S with a proposed total depth of 800 feet. The document was produced by B, checked by G and CWC, and filed under the name WellConst.mxd. It appears to be an engineering or geological survey document related to well construction planning.

👤 Named in This Document
No named persons linked yet
🔑 Evidence Keywords

📋 Key Excerpts1

PersonKeyword
Excerpt 1
. / WELLFIELD WELL E-7871-S PROPOSED **CONSTRUCTION** DATE: 4/20/2012 800 TD = 800 FT PRODUCED BY: B BY CHECKED BY: FIGURE 2B G CWC W FILE NAME: WellConst.mxd

Discussion

Let the world know how you feel.

What you just read should make you angry. Channel that into 17 syllables. Our AI helps you craft a haiku in seconds — then share it with the world.

Power hides in dark But sunlight finds every crack Truth cannot be bought

— Sarah K., after reading this document
✍️ Write Your Haiku

Haikus for Humanity — 5 · 7 · 5

React
Share𝕏🦋FBinFund Accountability