Epstein Index›Documents›EFTA01107294
💨IMPACT LEVEL 1 — MEH

Epstein File EFTA01107294: Bedroom, Construction and Painting (DS9)

General DocumentDate unavailableEFTA011072941 keyword hits
1
views
0
shares
0
reactions
0
persons
3
keywords
3
excerpts

This document is a construction and maintenance task list dated June 2, 2018, detailing work on a master bedroom including lock installation, HVAC timer reviews, exterior door shutter design (rejected by 'JE'), painting projects, and landscape work including hydro-seeding and planter box construction. Multiple items are marked as priority or pending approval.

👤 Named in This Document
No named persons linked yet
🔑 Evidence Keywords

📋 Key Excerpts3

PersonKeyword
Excerpt 1
Outside Master **Bedroom** - lock installation 6/2 18. Timers - review installing timers on air conditioners, irrigation water systems, and lights 19.
Excerpt 2
Berm/Top of Hill - dirt and rock needs on top of hill needs to go ASAP - hydroseed top of hill - 4 large planter boxes with small planter inside require **construction**
Excerpt 3
Five Palms - TOP PRIORITY - Laying conduit and pulling cable - continues - Exterior Door Shutters - PO rejected by JE, on hold awaiting design - **Painting**

Discussion

Let the world know how you feel.

What you just read should make you angry. Channel that into 17 syllables. Our AI helps you craft a haiku in seconds — then share it with the world.

Power hides in dark But sunlight finds every crack Truth cannot be bought

— Sarah K., after reading this document
✍️ Write Your Haiku

Haikus for Humanity — 5 · 7 · 5

React
Share𝕏🦋FBinFund Accountability