Epstein Index›Documents›EFTA01113629
💨IMPACT LEVEL 1 — MEH

Epstein File EFTA01113629: Construction, Submission and Architect (DS9)

General DocumentDate unavailableEFTA011136291 keyword hits
1
views
0
shares
0
reactions
0
persons
4
keywords
6
excerpts

This document is a construction submission checklist for an architectural project, requiring submission of materials removal plans, surveys, elevations, and detailed drawings. The architect of record is listed as Smith and Moore Architects, Inc., with a contact address and phone number provided. The checklist specifies that electronic submission is required as of June 21, 2010, though paper mini-sets are also required.

👤 Named in This Document
No named persons linked yet

📋 Key Excerpts6

PersonKeyword
Excerpt 1
(must show any and all adjacent right-of-way) Materials Removal Plan (must defineate any and all materials that are to be removed or relocated in the **construction**
Excerpt 2
Survey (for new **construction**) Existing and Proposed Elevations (on same page) Details such as columns, railings, awnings, signs, etc. drawn to scale Floor
Excerpt 3
**SUBMISSION** CHECKLIST: (Submit all of the following, as required for your project) (Please note that effective June 21, 2010, electronic **submission** is required

Discussion

Let the world know how you feel.

What you just read should make you angry. Channel that into 17 syllables. Our AI helps you craft a haiku in seconds — then share it with the world.

Power hides in dark But sunlight finds every crack Truth cannot be bought

— Sarah K., after reading this document
✍️ Write Your Haiku

Haikus for Humanity — 5 · 7 · 5

React
Share𝕏🦋FBinFund Accountability