Epstein Index›Documents›EFTA01119140
💨IMPACT LEVEL 1 — MEH

Epstein File EFTA01119140: Arrangement and Rubbing (DS9)

General DocumentDate unavailableEFTA011191401 keyword hits
1
views
0
shares
0
reactions
0
persons
3
keywords
3
excerpts

This document is a technical specification and agreement for boat construction, including enclosures detailing technical specifications, drawings, general arrangement, and repair components such as Hypalon patches and valves. The document is a commercial contract for vessel construction and is unrelated to the Epstein case.

👤 Named in This Document
No named persons linked yet
🔑 Evidence Keywords

📋 Key Excerpts3

PersonKeyword
Excerpt 1
The BOAT will be built according to: - Enclosure No. 1 - Technical Specification of the BOAT - Enclosure No. 2 - drawing- - General **Arrangement** - Enclosure
Excerpt 2
ARTICLE 11 ENCLOSURES TO THE AGREEMENT Enclosure No. 1 - Technical Specification of the BOAT Enclosure No. 2 - drawing - General **Arrangement** Enclosure
Excerpt 3
1 pc - repair set (big version) - ORCA Hypalon patches - 1 pc - Leafield valves - 3 pcs of each (A6 and C7) - D-rings for the tube - 4 pcs - fender (**rubbing**

Discussion

Let the world know how you feel.

What you just read should make you angry. Channel that into 17 syllables. Our AI helps you craft a haiku in seconds — then share it with the world.

Power hides in dark But sunlight finds every crack Truth cannot be bought

— Sarah K., after reading this document
✍️ Write Your Haiku

Haikus for Humanity — 5 · 7 · 5

React
Share𝕏🦋FBinFund Accountability