Epstein File EFTA02021854: Contractor and Painting (DS10)
This document contains contractor quotes for an entrance hall lighting project at a property belonging to Jeffrey Epstein. It compares two proposals: the first from a general contractor quoting $4,800.00 for light fixtures at $600.00 each (8 lights) with a total turn-key installation cost of $14,730.00, and a second contractor proposal showing light fixtures at $300.00 each with a total cost of $6,619.00 for fixtures and installation, with no ceiling repair or painting included.
📋 Key Excerpts3
📄 Original Document
Read the full document (120 words)
Opens original DOJ file on justice.gov
View on Justice.gov ↗🔗 Related Documents
Epstein File EFTA00148578: Obama, Harris and Berman (DS9)
Epstein File EFTA00135369: Andrew Clyde, Clyde and Suicide Watch (DS9)
Epstein File EFTA00086564: Audrey Strauss, Comey and Medical Examiner (DS9)
Epstein File EFTA00123188: Berman, Alison Moe and Brian Fitzpatrick (DS9)
Discussion
Let the world know how you feel.
What you just read should make you angry. Channel that into 17 syllables. Our AI helps you craft a haiku in seconds — then share it with the world.
Power hides in dark But sunlight finds every crack Truth cannot be bought
— Sarah K., after reading this documentHaikus for Humanity — 5 · 7 · 5